28.01.2023

Transportation & Installation


The building is transported to the plot as a single module on a trailer. The installation process on-site is efficient and precise, requiring minimal labor.

The entire process, including the building’s installation, terrace construction, and external connections, can be completed in just one day.

On-site preparation is minimal, as the Smart LOFT only requires a flat substrate that can be accessed by a crane, as well as available water, sewer, and electrical connections.

The building’s lifting and installation can be carried out by the Smart LOFT installation team, its partner company, or a local contractor.