Transportation and installation


The building is transported to the designated location as a single module on a trailer.

Installation on-site is efficient and precise, with minimal labor requirements. The entire process, including the installation of the building, the construction of a terrace, and the completion of external connections, can be completed in just one day.

The preparatory work required on-site is minimal, as the Smart LOFT only needs a flat surface that can be accessed by a crane, as well as access to water, sewerage, and electrical connections.

The lifting and installation of the building can be carried out by the Smart LOFT installation team, a partner company, or a local contractor.